Manchester airport’s new 3,800 space car park for Terminal 2 has opened ahead of programme, utilising Triflex ProPark waterproofing and surfacing system to the 10,000m² top deck of car park installed between November and March despite cold temperatures. Applied by Authorised Contracting Partners, Mike Thelwell Flooring Ltd. Triflex's PMMA waterproofing solution was able to be installed at temperatures down to 0°C allowing the system to be applied in shorter weather windows between rain or snow, maximising the available installation time throughout the cold months of winter.
09.07.2019